Preloader

Waltham Forest Civic Centre

Project Overview

Client / Project Name

Waltham Forest Civic Centre

Sector

Public Sector / Local Authority

Location

Forest Road, London, E17 4JF

Commissioning Date

27 March 2026

Technical Specifications

System Size

59 kWp

Solar Panels

130 × Trina Vertex S+ 455W - TSM-455NEG9R.28

Roof Type

Sedum Roof

Mounting System

Self-ballasted Van Der Valk

Performance & Financial Impact

Predicted Annual Generation

48,680 kWh

Electricity Offset

Approx. 5%

Estimated Annual Utility Cost Savings

Approx. £12,500

Estimated CO₂ Savings

25.2 tonnes per year

Solar PV panels on the sedum roof at Waltham Forest Civic Centre, London

About the Project

The Waltham Forest Civic Centre project involved the installation of a 59 kWp solar PV system at the Civic Centre on Forest Road, London.

The system was commissioned on 27 March 2026 and includes 130 Trina Vertex S+ 455W solar panels, installed on a green/biodiverse roof.

The solar PV system is expected to generate approximately 48,680 kWh of electricity each year. This will help the Civic Centre generate more of its own electricity on site and reduce its reliance on electricity from the grid.

The installation is also expected to save approximately 25.2 tonnes of CO₂ each year, helping to reduce the building’s carbon footprint and support its wider sustainability objectives.

The project makes effective use of the available roof space while incorporating renewable energy alongside the existing green and biodiverse roof. This provides a practical approach to generating clean electricity while supporting the building’s wider environmental and sustainability objectives.

Sector

The Waltham Forest Civic Centre is an important public building serving the local community.

Solar PV is well suited to public-sector buildings where there is regular daytime electricity use. By generating renewable electricity on site, the Civic Centre can reduce its reliance on grid electricity while helping to lower its carbon emissions.

The project demonstrates how renewable energy can be incorporated into existing public buildings while working alongside green and biodiverse roof spaces. It provides a practical example of how solar generation can form part of a wider approach to improving the sustainability of public buildings.

Generation and CO₂ savings figures are estimates and will vary depending on operational and environmental conditions.

Johnny Clarke Contracts Manager, Antrim Electrical & Mechanical Engineers said:

“We’ve worked with Ablaze on a number of projects, and their workmanship and professionalism consistently meet a high standard. I have always found Francky and his team at Ablaze to be extremely helpful and professional in handling any issues that arise during PV installations.”